Robson Civil Projects has now completed the civil works on two new stages in the Crangan Bay residential subdivision for our valued client Scape Properties.
Comprising of 140 residential lots on 10 hectares, Crangan Bay Stages 4 & 5 are located in close proximity to the shores of Lake Macquarie and borders the nearby National Parks Land.
The scope of work included:
Site establishment
Site clearing and grubbing
Topsoil stripping and replacement
Bulk earthworks
Underground stormwater drainage (pit and pipe)
Stormwater treatment basin
Gravity sewer and rising main relocation
Utility services (electrical and NBN)
Road pavement construction
Signage and line marking
Pedestrian footpaths
Retaining walls
Landscaping
Project gallery
Highlights
Robson have been effective in creating a substantial stormwater drainage system consisting of approximately 3200m of pipework reporting through one existing, and two new Gross Pollutant Traps. A 2700m gravity sewer system has been installed and connected to the existing infrastructure.
A few standout visual features of this project include 2600m² of off-white masonry blockwork retaining walls paired with the black powder coat finish of the streetlights, basin fencing and road signposts. The sandstone rock-lined swale further adds to the visual appeal while creating an affective drainage solution.
Two permanent basins have been constructed, both with an insitu steel reinforced concrete headwall at the outlet of the gross pollutant traps. These Basins feature attractive landscaping with mass planting and black custom fabricated fencing.