PROJECT DETAILS
CLIENT:
Bovis Lend Lease
LOCATION:
Top Ryde, NSW
VALUE:
$22.1m
DURATION:
20 months
Top Ryde Shopping Centre Redevelopment
Bulk Excavation
Scope of work
Bulk excavation and removal of approximately 500,000m³ of material to a depth of up to 20 metres
Detailed excavation, including supply and placement of reinforcement and concrete to the entire basement area of the new structure
Demolition of existing structure concrete slabs and pavements from original shopping centre
Earthworks associated with preparation of cut and fill platforms for Piling Rig contractor
Construction of retention system utilising 1000 anchors and 7500m² of shotcrete
Associated preliminary works including environmental controls such as road sweeping, dust & noise vibration monitoring and reporting, traffic controls and management of large volumes of truck movements on site with full time truck allocatur present
Project highlights
The excavation works involved over 100 truck movements per hour with multiple load out points, truck marshalling and co-ordination issues.
Community liaison was carried out in conjunction with the client as the site was adjacent to multiple offices and schools.