PROJECT DETAILS
CLIENT: Australian Rail Track Corporation (TEJV Alliance)
LOCATION: Mindaribba Rail Crossing Loop, NSW
VALUE: $1.5m
DURATION: 4 months
Mindaribba Rail Underbridge Duplication
Scope of work
- Dam and divert existing watercourse
- Construct footings
- Extend existing abutments and wing walls
- Demolish existing timber single line bridge
- Construct new dual line concrete bridge deck
- Construct walkways and approach slabs
- Construct new gabion lined creek bed
Project highlights
- Works completed between trains on an operational rail line
- The mainline side of the bridge reconstruction was accelerated to meet with ARTC’s predetermined possession date
< Back